Installation
ADELTE contracted by Port Miami (Miami Dade County) installed two symmetrical SEDNA-type SPBBs for NCL’s new Cruise Terminal B and one SEDNA-type SPBB for Cruise Terminal C. The two SPBBs for Cruise Terminal B were delivered in time for the inauguration of NCL’s new iconic terminal, which is known as the “Pearl of Miami”. All three SPBBs are capable to operate with the current and future cruise vessels, including those with overhanging lifeboats. With this installation Port Miami has a total of eight ADELTE SPBBs in operation at the Cruise Terminals B, C, D and F.