Installation
At Liverpool’s Isle of Man ferry terminal, ADELTE installed a CENTAURUS boarding bridge. The installation of the boarding bridge tunnel was spectacular as it needed to be lifted straight over the terminal building.
Products Installed
Location
Liverpool, UK