Installation

In an important process of expansion towards the Latin American market, in July 2001, we supplied Aeropuertos de Argentina 2000 with passenger boarding bridges for Iguazú (Argentina).
This contract, which was signed in September 2000, consists of two glass sided Apron Drive passenger boarding bridges, in two increasing body sections, model PTT-175/275-2CA. With a minimum docking height of 1.6 meters, these passenger boarding bridges have a totally glass sided exterior, in a rectangular design, and in their interior they are equipped with Alto floor covering, PL fluorescent lighting and stainless steel guide tracks in the lower corners. These passenger boarding bridges also come with a reinforced concrete foundation anchoring system. Their lifting and traction mechanisms have an electrical activation system.
Location
Iguazú, Argentina

Get our Reference List

Discover our Passenger Boarding Bridges projects
at Airports around the world

Explore recent projects

ADELTE has extensive experience in the design, manufacture, installation and
maintenance of PBBs at airport, cruise and ferry terminals around the world