Installation
Caledonian Maritime Assets contracted ADELTE to design, manufacture and install a THALASSA Passenger Boarding Bridge with Enclosed Elevated Walkways at the Ferry Terminal in Brodick, on the Isle of Arran in Scotland. The THALASSA SPBB has the ability to serve at dock level, absorb big tidal variations and operate with very strong service winds.
Products Installed
Location
Brodick, United Kingdom