Installation
Creuers del Port de Barcelona, S.A. inaugurated the newly constructed Terminal A on the Adosado Quay which by means of an elevated walkway is connected with Terminal B. The terminals can handle the embarkation and disembarkation of the worlds largest cruise vessels, for turnaround operations as well as for check-in. ADELTE has delivered a HYDRA boarding bridge at Terminal A which is similar to the two bridges at Terminal B.