Installation
ADELTE has accomplished the delivery of six new Passenger Boarding Bridge for the Terminal C of Baghdad International Airport. Technical advanced Apron solutions, which have improved docking, passenger embarkation and disembarkation and maintenance operations at the first Iraq Airport, contribute to ICAA’s goal of doubling its current capacity up to 15 million passengers per year.
According to the contract awarded by the Iraq Civil Aviation Authority (ICAA), ADELTE has provided six walkways and six Apron Drive PBBs equipped with glass-sided tunnels, hydraulic mechanism, twelve rooftops and nine 400Hz Power Units.
Products Installed
Location
Baghdad, Irak