• 5 December, 2012

TEAM honored at the Seatrade Insider Cruise Awards 2012

Barcelona, 5th of December 2012 – TEAM Ports & Maritime received the “Supplier of the Year” finalist award in the sixth Seatrade Insider Cruise Awards presented at the Seatrade Med 2012 in Marseille, France.

“Once again we feel honored to receive this recognition from the cruise industry. We always put our client first and our goal is always to deliver the safest and technologically most advanced boarding systems for cruise terminals around the world” said Jordi Floreta, Vice President and Managing Director at TEAM.

Read More
  • 3 December, 2012

ADELTE supplies two Apron Drive Passenger Boarding Bridges in Valencia

Barcelona, 3rd of December 2012 – AENA Aeropuertos, the world’s leading airport operator in terms of passenger numbers chose ADELTE to supply its new generation Apron Drive Passenger Boarding Bridgess in Valencia (Spain), where the number of annual travelers is expected to increase from 7 to 15 million over the next few years. The PBBs are successfully operating at gates E16 and F17.

Innovative design

The unique design of ADELTE’s Apron Drive is specially adapted to meet the demands of  a wide range of aircrafts, airline companies, and regional and busy, rapidly-growing airports. It offers the latest technology  innovations in addition to significant improvements, including the new cabin,  which provides a larger and brighter space for passengers to pass through with ease and comfort; more responsive and precise driving technology; and a traction and lifting mechanism that offers better efficiency and very easy access for maintenance work.

Read More
  • 20 November, 2012

ADELTE contracted to deliver two Passenger Boarding Bridges at the Manhattan Cruise Terminal

Barcelona, 23rd of November 2012 – ADELTE Ports & Maritime has been awarded by the New York City Economic Development Corporation (NYCEDC) and Turner Construction Corporation a contract to design, manufacture, assemble, transport and install two HYDRA Passenger Boarding Bridges (PBBs) at the Manhattan Cruise Terminal in New York. The Passenger Boarding Bridges will provide seamless access for cruise guests from cruise terminal building to NCL’s Breakaway and vice versa. The NCL Breakaway will start turnaround operations in New York as of May 2013.

Read More
  • 28 September, 2012

New APRONAUT’s website launched!

Barcelona, 28th of September 2012 – ADELTE Airport Technologies, an engineering company that designs and manufactures Passenger Boarding Bridges and innovative solutions for airports around the world, launches the new Website of APRONAUT, the first Passenger Boarding Bridge Docking Simulator.

APRONAUT is an advanced and efficient solution to train operators and to ensure safe and successful PBB docking.

Read More
  • 26 July, 2012

ADELTE designs two double-cabin Passenger Boarding Bridges for Cape May and Lewes Ferry Terminals

Barcelona, 26th of July 2012 – ADELTE, the world leading designer and manufacturer of sophisticated Passenger Boarding Bridges (PBBs) for cruise and ferry terminals, will design, manufacture and install two PBBs to replace the existing Passenger Boarding Bridges at Cape May and Lewes. With the aim of significantly improving their installations, Delaware River and Bay Authority will modify the two main berths in both terminals. JPC has been contracted to carry out the overall work on the berths where ADELTE’s Passenger Boarding Bridges will be operating.

ADELTE’s specific challenge in this project is to ensure that a ship can be docked in both sides of the berths. The uniqueness of this double docking fits perfectly with ADELTE’s philosophy about designing tailor-made solutions for every port.

Read More
  • 12 June, 2012

Marseille entrusts ADELTE with a new Ferry Passenger Boarding Bridge

Barcelona, 12 June 2012 – ADELTE, the world’s leading designer and manufacturer of sophisticated Passenger Boarding Bridges (PBBs) for cruise and ferry terminals, has been contracted by the Grand Port Maritime in Marseille to design, manufacture, and install a PEGASUS-type PBB for berth No. 7 at La Joliette quay.

“We are delighted to be awarded this contract. It underlines the good relationship we always build with our clients, based on the trust and confidence in our passenger boarding bridges as regards safety and security“ explained Jordi Floreta, Managing Director of ADELTE.

Read More
Load More